Laserfiche WebLink
roads w~ be constructed paralle l tonot.raphie <br />contour and aligned to traverse na ural clearings <br />etc. in order to minirr,i~e r~~noff and disturbance. <br />P.ppropriate runoff controls c;i11 be constrt:cted as <br />needed. Unless it is shop;n to be the best alter- <br />native alignment, no streams or caet areas o:i11 be <br />traversed. <br />All exploration areas ~•:i11 be o-rithin the perr..it <br />zrea and will be regraded and new roads drill be <br />bladed. Topsoil that c;as removed prior to <br />construction of drill si*_es and roads tai 11 be re- <br />vlaced followinS recontouring. Revegetation of <br />drill sites and new roads will be carried out ir. <br />accordance with procedures and seed mixtures <br />required by Section 816.111-.117 e~:cept that <br />seeding will be by brozdcast rather than drilling. <br />In places where mining will ituaediately follow <br />exploration, drill sites and new roads ~;ill be <br />Wined through and then reclzi;:ied in accordance c:ith <br />the Reclaration Plan set forth under 30 CFR 780 <br />and the relevant subsection of Section b16. <br />Adherence to *_he proposals and procedures <br />described above will put *_he zpplicant in cos~pliance <br />Frith Section 815.15. <br />P.evisior.s to Applicant's °roposal <br />None <br />E <br />Reanalysis of Compliance <br />None <br />F. Stipulations <br />:]one <br />G <br />Sunmary of Compliance <br />l•Iill Comply <br />H. Proposed Departmental Action <br />To approve the application as proposed with respect <br />to 30 CFR 815.15 <br />