My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12340
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12340
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:41 PM
Creation date
11/19/2007 2:29:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Application Correspondence
Doc Date
12/12/2006
Doc Name
Charles Overton Comments
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Charles Overton public meeting 12 Dec 2006 NorthSeld Mine Project page 9 of 10 <br />Page 113 <br />Section 2.05.6 <br />~~o(2)(q (iv) A plan based on the probable hydrologic consequences <br />determination and baseline hydrologic and geologic information <br />submitted tct comply with 2.04.5, 2.Q4.6, and 2.04.7 for the <br />collection, recording, and reporting of ground and surface water <br />quality and quantity data. The plan, in accordance with 4.05.13, <br />shall identifymonitoring site locations, points of compliance, <br />parameters, sampling frequency, and describe how these data will <br />be used to determine the impact on the hydrologic balance. At a <br />minimum, the hydrologic monitoring plan shall include:. <br />(A) Monitoring of at least total dissolved solids or electrical <br />conductivity corrected to 25N centigrade (specific <br />conductance), pH, manganese and iron; <br />(B) Monitoring of water levels, reported as feet above or <br />below land surface datum, for ground water plans; <br />(C) Monitoring of total suspended solids and flow rate <br />measurements for surface water plans; and <br />(D) Monitoring for additional water quality constituents may <br />be required by the Division based upon site speck <br />conditions, approved post mining land use, or for good <br />cause shown. <br />(v) A hydrologic reclamation plan spec~cally addressing any <br />potential adverse hydrologic consequences identified in the <br />probable hydrologic consequences determination prepared based <br />upon 2.05.6(3)(b) (iv) and shall include preventive and remedial <br />measures as necessary to prevent material damage to minimize <br />hydrologic impacts, and to meet the performance standards of 4.05. <br />(vi) The location of each water diversion, collection, conveyance, <br />treatment, storage, and discharge facility to be used within the <br />permit area. <br />(vii) A plan for the restoration of the approximate rettharge capacity <br />of the permit area and adjacent area in accordance with 4.05.12(3). <br />
The URL can be used to link to this page
Your browser does not support the video tag.