My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12335
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:41 PM
Creation date
11/19/2007 2:29:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Application Correspondence
Doc Date
8/24/1979
Doc Name
Mine Plan Modification
To
BEAR COAL CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_, <br /> <br />Dear Coal Company, Inc. (cont.) <br />constructed and operated to accordance with 30 CFR Part D17 1n order to <br />avoid the need for future reconstruction. In the event that runoff from <br />the undisturbed areas is greater than that calculated to determine the <br />size of sedimentation ponds, the retention volumes of the ponds shall be <br />Increased as necessary to comply with applicable regulations. <br />I appreciate the time and effort you spent in developing a plan that pro- <br />vides sufficient information to facilitate our review. Please also convey <br />my staff's appreciation to Ute Engineering for their help. I wish to under- <br />score the fact that Departmental reviews of changes 1n mining plans must <br />comply with the Surface Piining Control and Reclamation Act of 1977. That <br />Act requires a thorough analysis of whether the proposed actions will comply <br />with environmental protection performance standards. That Act also requires <br />public participation. 4Je must allow adequate time for reviews and public <br />participation especially when the modifications have the potential for <br />envirorunental impacts. Whenever possible, plans should address future <br />activities well in advance of the proposed dates for implementation. <br />This approval is subject to any additional stipulations determined to be <br />necessary by the regulatory authority. <br />Sincerely, <br />Jiary 4lright <br />Acting Regional Director <br />Attachments: <br />I. Area drawing <br />II. Statement of Stipulation <br />JH/plo: 8/24/79. <br />CONCURRGN CE9 <br />`FIC! <br />R NAME, <br />,TE ' ..........._._ ...................................... .................................. .................. .. ............. ...................... ...... .. .. .. .. .. .. .... .................... .............................. ... .... .... ......... <br />' OFFICIAL FILE COQ' <br />nro e1n~n' ht ~,1, L <br />
The URL can be used to link to this page
Your browser does not support the video tag.