Laserfiche WebLink
<br /> <br />Adequacy Issues Identified During Completeness Review <br />Geologv - Rule 2.04 <br />1. Core holes used for the chemical analyses are not identified on the <br />laboratory analyses sheet to Appendix 3.3-1 and are not located on the <br />geologic map. This information must be submitted. <br />2. A detailed geologic map and cross-sections are needed for the mine's <br />surface facilities, rail line, load-out, and refuse disposal area. <br />Detailed descriptions are also needed for the surflcial deposits in <br />these area. <br />HVdrology DescrlDtton: Ground Nater - Rule 2.04.7(1) <br />The baseline hydrology 15 inadequate for the streams, springs, <br />irrigation ditches, colluvtal aquifers, and alluvial aquifers within the <br />surface facilities area, load-out, rail line, and the coal processing <br />waste disposal site. Full baseline collection should continue until a <br />year's worth of data has been collected. The applicant should then plot <br />and analyze the baseline data and describe the seasonal fluctuations to <br />the water qualities and quantities of both surface and ground water. <br />Hvdrology DescrlDtlon: Surface Mater - Rule 2.04.7(1) <br />1. Surface water site CR-2 has no corresponding flow measurements for <br />sampling events. If the applicant plans to use flow from U.S.G.S. <br />station at Glenwood Springs, this flow data should be submitted for the <br />period covered by sampling at site CR-2. This data should be presented <br />in a readily usable form such as a hydrograph. <br />Vegetation Information - Rule 2.04.10 <br />1. Storm King must revise the vegetation map to show the locations of <br />reference areas and sampling sites. <br />2. The application does not delineate the total acreages of vegetation <br />communities to be disturbed. Only the acreages at the surface <br />facilities and portions of the waste disposal area are addressed. <br />Storm King must revise the application to include acreages for other <br />disturbances such as the haul road, slurry pipeline, and reclaim water <br />pipelines. <br />3. The discussion of revegetatton success standards is unclear. Storm King <br />must either cornett to use standards derived from reference area sampling <br />during bond release or state what the proposed standards will be. <br />4. A description of the double sampling methodology used in the collection <br />of baseline vegetation data must be submitted. <br />