<br />Calendar
<br />Year P.S, Contract
<br />No 1 (Tons) I,P, Contract
<br />(Tons) P,S. Contract
<br />No. 2 (Tons) Total
<br />Tons
<br />1978 (3/1-12/31) 1,666,600 714,530 1,017,292 3,459,422
<br />1979 2,000,000 913,000 1,100,000 4,013,000
<br />1980 2,000,000 913,000 935,000 3,848,000
<br />1961 2,000,000 913,000 770,000 3,683,000
<br />1982 2,000,000 913,000 -- 2,913,000
<br />1983 2,000,000 913,000 -- 2,913,000
<br />1984 2,000,000 913,000 -- 2,913,000
<br />1985 2,000,000 913,000 -- 2,913,000
<br />1966 2,000,000 380,420 -- 2,380,420
<br />1987 1.000000 -- -- 1.000.000
<br /> 18,666,600 7,546,950 3,822,292 30,035,842
<br />Should Energy Fuels be the successful bidder and be awarded
<br />the lease, the planned mining operation would involve the
<br />expansion of Pit U1 in a southwesterly direction to mine the
<br />Wadge coal seam across application C-22644. The thickness
<br />of the iladge seam averages about 10.0 feet across the
<br />parcel, The coal is high volatile C bituminous and has an
<br />average heating value of 10,900 Btus per pound. Sulfur
<br />content averages 0.55 percent, ash 8.6 percent, and moisture
<br />11,50 percent, The total recoverable reserve base within
<br />the 2120,36 acre tract is estimated to be 5,011,090 tons.
<br />Mining of the tract is expected to begin in June of 1979 and
<br />would employ three primary overburden removal machines. A
<br />boxcut would be opened in the northeast quadrant of the
<br />lease application area with a Marion 204 28 yard bucket
<br />capacity shovel. The boxcut would proceed in a southwest-
<br />erly direction along the strike of the coal seam, A
<br />Bucyrus-Erie 770 21 ~~~ /
<br />Ayard bucket capacity dragline would