Laserfiche WebLink
<br /> <br />Calendar <br />Year P.S, Contract <br />No 1 (Tons) I,P, Contract <br />(Tons) P,S. Contract <br />No. 2 (Tons) Total <br />Tons <br />1978 (3/1-12/31) 1,666,600 714,530 1,017,292 3,459,422 <br />1979 2,000,000 913,000 1,100,000 4,013,000 <br />1980 2,000,000 913,000 935,000 3,848,000 <br />1961 2,000,000 913,000 770,000 3,683,000 <br />1982 2,000,000 913,000 -- 2,913,000 <br />1983 2,000,000 913,000 -- 2,913,000 <br />1984 2,000,000 913,000 -- 2,913,000 <br />1985 2,000,000 913,000 -- 2,913,000 <br />1966 2,000,000 380,420 -- 2,380,420 <br />1987 1.000000 -- -- 1.000.000 <br /> 18,666,600 7,546,950 3,822,292 30,035,842 <br />Should Energy Fuels be the successful bidder and be awarded <br />the lease, the planned mining operation would involve the <br />expansion of Pit U1 in a southwesterly direction to mine the <br />Wadge coal seam across application C-22644. The thickness <br />of the iladge seam averages about 10.0 feet across the <br />parcel, The coal is high volatile C bituminous and has an <br />average heating value of 10,900 Btus per pound. Sulfur <br />content averages 0.55 percent, ash 8.6 percent, and moisture <br />11,50 percent, The total recoverable reserve base within <br />the 2120,36 acre tract is estimated to be 5,011,090 tons. <br />Mining of the tract is expected to begin in June of 1979 and <br />would employ three primary overburden removal machines. A <br />boxcut would be opened in the northeast quadrant of the <br />lease application area with a Marion 204 28 yard bucket <br />capacity shovel. The boxcut would proceed in a southwest- <br />erly direction along the strike of the coal seam, A <br />Bucyrus-Erie 770 21 ~~~ / <br />Ayard bucket capacity dragline would <br />9 <br />