Laserfiche WebLink
<br />.- <br />. blr. U. Larry Uamrau -2- <br />l,. i•liscellaneuus <br />1. Fan removal -use assumptions in A, <br />anJ estimate 1 hour <br />2. Heater removal - same <br />u. Ousts <br />9;£i43 yd~ - u5.25 yd3/nr x $2u2.UU/hr <br />Fan anri heater <br />Uvernead, lu% <br /> <br />April 14, 19da <br />2U2.U0 <br />"LUL.OU <br />$su,4~l.s2 <br />$4Ua.UU <br />s, U87. 50 <br />Total $33,yu3.4U <br />The Uond a~uount for the proposed Foidel Creek cline in the resprinse to <br />Adequacy Review letter gated i•larcir 31, 19~JS is $1,b34,531.UU. ''+lith the <br />addition of building removal casts this figure ueco~nes $1,6tid,594.4U. <br />The Division proposes to set Uond for the Foidel Creek Permit rlevisiun at <br />$l,bbu,6uu.uu. ~ ~- <br />if you have any questions on trrese figures, please Feel free to call. <br />• sincerely, <br />Jandra L. Emrich <br />keclamation Specialist <br />SLL/eap <br />Uoc. Igo. 2289 <br />