Laserfiche WebLink
<br />K <br />Fichartl D Lamm <br />Governor <br />Apri I l~l, i9c;.f <br />r <br />i•ir. U. Larry Uamrau <br />Getty Uil Company <br />23335 Itoutt County .toad s3 <br />Oak Creek, Colorauo 30467 <br />ite: Fuidel Creek Permit iivision uondiny <br />Dear ,~1r. Uamrau: <br />The Division has reviewed the reclamation cost estimates fur the proposed <br />Foidel Creek I•line, tverytniny looks alriynt except for the reniaval of <br />facilities. The Division cannot accept salvaye value far the cost of <br />surface buildiny re~uoval. Therefore, these cots must Ue included in the <br />final bond amount. .de have calculated costs fur this as described <br />uelow. All strucun-es are assumed to ue metal. <br />Structural UetdoliCiun Costs <br />A. Assumptions <br />1rorewan <br />2 }iuilrJiny Lauorers <br />1 Loader and Uperator (track-type) <br />i haul truck and operator (lU Cu. yd.) <br />Estimated hourly production = u5.[u yd3/nr <br />B. Volumes <br />Structures <br />$20.70/hr <br />$2J.5U/hr <br />$100.30/hr <br />$51.51/iir <br />Total $202.00/hr <br />Volume (yd3) <br />1. heater fuel tank - h = 2U', r=1U' 58 <br />2. Shed - 5U' x 3U' x lU' 555 <br />3. Fuel tanks - r=1U' , h=4U' 930 <br />4. ;loll house - LU' x ZU' x lU' 143 <br />5. dater tank - r=[U' , h=3U' 1,s95 <br />v. Shop and +larehouse - lUU' x ;,U' x 15' 2,777 <br />7. office - 5U' x ;,U' x IU' X25 <br />3. uatnhouse - lUU' x 5U' X 15' 2,777 <br />9. Conveyor -Assume ti+idth and height of 5', 3UU' long [73 <br /> TOtdl 9,343 <br />DEPARTMENT OF NATURAL RESOURCES 999 <br />D Monle Pascoe. Execntmn D~rno~or <br />MINED LAND RECLAMATION DIVISION ~ <br />DAVID C. SHELTON Director <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3.567 <br />