Laserfiche WebLink
<br />Date Sept 30, 1983 <br />Ref. pages in Permit 17,E , 7~T~77f~ST7RZ <br />Ref. Map 4_,8 <br />Stipulation No. 6 <br />13RIOR TO THE COMMENCEMENT OF ANY SURFACE COAL MINING AND <br />RECLAMATION OPERATIONS AT THE PRYOR MINE, THE APPLICANT <br />MUST PROVIDE A TOPSOIL SALVAGE PLAN WITH JUSTIFICATION OF <br />SOIL SALVAGE DEPTHS IN ACCORDANCE WITH RULE 2.05.2(2)(d). <br />Stipulation No. 10 <br />TOPSOIL AND SUBSOIL HANDLING AND REDISTRIBUTION METHODOLOGY <br />MUST BE REVISED IN ACCORDANCE WITH INFORMATION DERIVED FROM <br />SOIL SAMPLING. THIS REVISED SOIL HANDLING AND <br />REDISTRIBUTION METHODOLOGY MUST BE SUBMITTED TO THE <br />DIVISION WITHIN,6 MONTHS OF PERMIT ISSUANCE. <br />Reply <br />The replies to Stipulations 6 and 10 are combined since the <br />areas of concern are directly interrelated. <br />The results of the soil sampling done in August of 1983 <br />have been submitted with the reply to Stipulation No. 2. <br />Utilizing both the 1983 results and the 1981 results the topsoil <br />and subsoil thicknesses for the areas to be mined under this <br />permit are: <br />TABLE 6.1 Soil thicknesses, in inches <br />Mine area <br />1983-84A Topsoil Su <br />bso <br />il <br />LTE Sample 7 5 ~ <br />+~ <br /> 8 6 0 <br /> AF 3.1 2 28 <br /> Average Ti - ~+ <br />TM Sample AF1.3 15 45+ <br /> AF1.2 15 45+ <br /> AF1.1 15 45+ <br /> Average 15 <br />1984 B+C <br />LTE Sample AF2.1 2 13 <br /> AF2.2 6 10 <br /> AF2.3 4 6 <br /> Average T ~ <br />