My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12152
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:30 PM
Creation date
11/19/2007 2:27:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Application Correspondence
Doc Name
CANADIAN STRIP MINING AND RECLAMATION PLAN WYOMING FUEL CO - TECHNICAL AND ENVIRONMENTAL ANALYSIS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SURFACE WATER <br />C <br />~ ~ Water Control Plan <br />.I <br />a <br />~ <br />~ ~ <br />~\ <br />~`v,k The applicant has proposed a system of diversion ditches, <br /> impoundments, and sedimentation ponds to control runoff. As <br /> shown in Figure 2, most of these structures are satisfactorily <br />•~~ <br />~' <br />located to ensure that no runoff from disturbed areas enters <br /> North Fork of Bolton Draw. The one exception is runoff from the <br /> <br />~~~ ~ area of Phase IX. Water control should be provided to route <br />~ ~~ le into the area which drains <br />drs~i-na~e_ from the propd Stock`i <br /> - <br /> to Pond 4. Therefore, the following stipulation is. proposed. <br />The applicant must review the proposed surface water <br />control plan and add additional ditches to control <br />runoff from Phase IX as necessary. This information <br />must be submitted before mining can begin in this <br />area. <br />Ponds and Impoundments <br />,~ <br />Four sedimentation ponds and one temporary impoundment are <br />~ ~ proposed. Of these, all but Pond 4 provide adequate storage for <br />~ ~ the 10 year, 24 hour event. Pond 4 is underdesigned because <br />~- ~- <br />,,~ yroundwater seepage (1,300 gpd maximum) was not included. In <br />o ~ order to rectify this deficiency, the following stipulation <br />~ should be implemented. <br />y <br />Pond 4 must be redesigned to provide sufficient <br />~ storage for sediment, the 10 year, 24 hour event, and <br />~ groundwater seepage as referenced in the calculations <br />` - in Appendix Q of the permit application. <br />~ 3 <br />No primary outlet is provided for the temporary impound- <br />ment.. The emergency spillway is correctly sized for the 25 year <br />' event, as is ditch E, but since the runoff from this 211 acres is <br />_72_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.