My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12152
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:30 PM
Creation date
11/19/2007 2:27:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Application Correspondence
Doc Name
CANADIAN STRIP MINING AND RECLAMATION PLAN WYOMING FUEL CO - TECHNICAL AND ENVIRONMENTAL ANALYSIS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the roads, ponds, ditches and fencing will be reclaimed in 1986. <br />The ponds, ditches, and fences [necessary to control grazing, see <br />4.15(5) on page 12 of Addendum II] will need to remain in place <br />until approximately 1996, the end of the 10 year liability per- <br />iod. <br />It should be noted that all of the unexplained problems with <br />the disturbed acreages are relatively small; plus or minus 10 <br />acres. However, because of the problems with verifying the over- <br />burden volumes, overburden movement and disturbed acreages, and <br />because all these items are critical to determining bond amounts, <br />the following stipulation is proposed (also see stipulation in <br />the Bonding Section of Chapter III of this TEA. <br />Before beginning mining in Pit 2, the applicant shall <br />submit all maps, drawings, calculations and assump- <br />tions used to determine yearly disturbed and reclaimed <br />acreages and total disturbed acreages for all years. <br />The calculations should include,' but not be limited <br />to: the limits of topsoil removal for each year; the <br />limits of mining for each year; the limits of back- <br />filling for each year; the limits of retopsoiling and <br />revegetation for each year; and the area disturbed and <br />reclaimed each year for pond, ditch and road construc- <br />tion and removal. <br />The applicant has not adequately demonstrated that the pro- <br />posed mining and reclamation operations can be successfully <br />accomplished. The applicant has not provided sufficient informa- <br />tion in the following areas. <br />1. Ability to achieve proposed postmining contours. <br />No pit limits, showing both the top and bottom eleva- <br />tions, of the total areas proposed for mining within the <br />proposed permit area, cross-sections, or volumetric cal- <br />culations were included within the permit application. <br />-60- <br />
The URL can be used to link to this page
Your browser does not support the video tag.