My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12137
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:29 PM
Creation date
11/19/2007 2:27:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Application Correspondence
Doc Date
5/1/1980
Doc Name
MEETING 4/24/80 GRAND MESA PERMIT APPLICATION FILE #77-232/US/C
From
MLR
To
GRAND MESA COAL CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w ~ <br />Mr. Retschke <br />May 1, 2980 <br />Page -9- <br />9) Geologic Information: We require the drill hole data, <br />a stratigraphic section of the mine plan area, a <br />general geologic map indicating the dip and strike <br />of the beds and an analysis of the strata directly <br />above and below the coal to be mined. <br />5) Groundwater Information: This should follow an <br />effective geologic discussion. We need to know <br />the aquifers in the area. <br />6) Water Rights: The issue of water rights will have to <br />be resolved before the Board, I will help you try to <br />sort this out with Ralph Kelling at the Montrose office. <br />7) Proof of Publication: Submit proof of publication to <br />us before the Board meeting. <br />8) Dam Stability: The sediment pond dam must be certified <br />by a professional engineer, and 3 piezometers must be <br />installed at the head of the dam (one at the toe and <br />2 at the flanks) as discussed with Jim Pendleton, our <br />'engineering geologist. <br />9) Bond Calculation: A bond amount must be figured before <br />presentation to the Board. <br />It is in your best interest to submit the above information as expeditiously <br />as possible, as we need time to adequately review newly submitted material <br />before the Board meeting without adequate time to review the material, the <br />staff cannot recommend approval of the permit. Therefore, we need the above <br />information by May 19th, 1980. Since I have spoken to you in person and <br />on the phone about these nine points, I feel you have had adequate time <br />to gather the information. However, if there are circumstances where you <br />cannot meet the May 19th deadline (for the May Board meeting) be sure to <br />call and I'll see whether or not the permit can be approved with stipulations. <br />I understand the inherent problems with dealing with Labs and consultants, but <br />our communication lines are always open. <br />Thank you for your diligent cooperation throughout this permitting process. <br />Sincerely, <br />Marion Dodson Paul <br />Reclamation Specialist <br />MDP:ys <br />
The URL can be used to link to this page
Your browser does not support the video tag.