Laserfiche WebLink
<br />copper selenium <br />iron zinc <br />lead <br />The pump tests, logs, etc. will be used to establish <br />transmissivity storativity, porosity and horizontal and vertical <br />permeability for each Formation. It is proposed that both holes <br />be completed by February 20, 1993. <br />Proposed completion diagrams for both wells are enclosed. <br />Ground Water Monitoring Plan <br />The long term ground water monitoring plan proposed below will be <br />incorporated into the permit application: <br />Monthly test of field parameters: <br />Hole 92-1, Hole 92-2, Mangrum well, Coal Gulch Mine well. <br />Quarterly Groundwater analysis: <br />Hole 92-1(in two formations), Hole 92-2, Mangrum well, Messier <br />well ~ ~,ec ~ov~ j (,~f~ . <br />Other Tests: <br />Estimate of pump rates of Messier well. <br />An annual report will be provided to the Division which includes <br />all analysis and tests and a discussion of any changes or <br />problems that have developed or could develop in the ground water <br />regime. . <br />This letter commits to all requirements of the November 18 <br />letter. We hope that this will satisfy completeness and that the <br />adequacy review will proceed. Please call me if you have any <br />questions. <br />~~` <br />Paul Baker Greg Lewicki <br />Pennsylvania West Coal Corporation Greg Lewicki and Associates <br />