My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11992
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:20 PM
Creation date
11/19/2007 2:26:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Application Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~~ <br />COLORADO WESTMOgELAND INC. <br />P. O. Box E, aonia, Coloradq B142B 0 303-527-4135 <br />•/ J <br />~' ~ , August 25, 1980 <br />' 1',, ~, <br />Mr. Floyd Johns n1~ <br />Office of Sutface Mining <br />Brooks Towers <br />1020 Fifteenth Street <br />Denver, Colorado 80202 <br />Dear Floyd: <br /> <br />,~.~{, ;~,. isso <br />I have reviewed the Orchard Valley Mine Plan submittal to assess the necessary <br />additions or changes to our plan to mine 1.3 million tons per year (tpy). Both <br />Sections 782,17 and 784.11 should be considered revised to reflect the likely <br />1.3 million tons per year (tpy) production. Section 784.11 will require substi- <br />tute changes as follows: <br />To mine 1.3 million tpy, the Orchard Valley Mine will require four (4) operating <br />sections, with one spare section. It is expected that each development unit <br />will average at least 600 tons per unit shift and each retreat unit will average <br />at least 650 tons per unit shift. Map No. 2 Volume 6 of our submitted Mine Plan <br />shows the mining sequence which will be necessary to achieve the minimum sched- <br />uled productivity. Equipment which will be needed in addition to that listed on <br />page 6, Section 784, Volume 1 of our submitted Mine Plan is: <br />Lee Norse Miner <br />Joy Miner <br />Fletcher Bolter (2) <br />Eimco LHD <br />Lube Vehicle <br />Personnel Carrier (3) <br />Teletrams (5) <br />Face Fans (5) <br />Boom Trucks (2) <br />If you have any questions please do not hesitate to contact me. <br />Sincerely, <br />~.~,+-a2IL~-d~Z~ <br />Patricia !jG Farnsworth <br />Mine Engineer <br />PMF:fec <br />cc: Chris Seglem, Vice-President - Government and General Counsel <br />,avid C. Shelton, Director, Mined Land Reclamation <br />® r <br />.~oi<ar or I <br />•a pq(lONO i 1 U{I I111~ +~~ lif J. <br />
The URL can be used to link to this page
Your browser does not support the video tag.