Laserfiche WebLink
David Berry -10- June 20, 1996 <br />elevation change of about 1500 feet. The DMG is correct. <br />There are two Juniper Woodland areas within the drainage area. <br />BRL picked the lower Juniper Woodland area to establish the <br />hydraulic length and elevation change. This results in the <br />highest peak flow calculation so it is the conservative <br />approach. If the DMG numbers are utilized, the peak flow <br />calculation decreases. BRL does not believe it is necessary <br />to revise the hydraulic length or elevation change for the D-3 <br />Juniper Woodland watershed. <br />41. The DMG requested that an annotation arrow be added from "C- <br />B1" to the appropriate culvert on Map 20. Enclosed is revised <br />Map 20 with an annotation arrow added from "C-B1" to the <br />appropriate culvert as requested by the DMG. <br />42. On Map 21-1, Drainage Plans, and on Map 20 Sedimentation <br />Control Plan, the DMG states there appears to be an unlabeled <br />ditch that leads into culvert C-B12. This is the beginning of <br />Ditch D-B24. It will be labeled on revised Maps 20 & 21-1. <br />Enclosed are revised Maps 20 b 21-1. <br />43. In the Culvert Summary and Minimum Size Requirements table on <br />page Exh-B-26, and referring to Map 21-1, Drainage Plans, for <br />culvert C-B12, the DMG states that ditch B-24 should be <br />changed to ditch B-19. The table is correct. The confusion <br />on this issue relates to the unlabeled portion of ditch B-24 <br />that in fact does flow to culvert C-B12. Please refer to page <br />Exh-8-64. The peak discharge for ditch D-B24 includes the <br />flow from ditch D-B19 and the flow from culvert C-B13. <br />44. The DMG asks why, in the Culvert Summary and Minimum Size <br />Requirements table on page Exh-8-26, culvert C-C13 and its <br />value of 1.88 cfs is used for culvert C-B12. Part of the <br />confusion on this issue is caused by a typo. Culvert C-C13 is <br />actually C-B13. Please refer to page Exh-8-64. The peak <br />discharge for ditch D-B24 includes the flow from ditch D-B19 <br />and the flow from culvert C-B13. Culvert C-B12 must handle <br />the flow from ditch D-B24 except culvert C-B13 enters ditch D- <br />B-24 after culvert C-B12. Therefore, the flow from C-B13 is <br />deducted from the design flow for culvert C-B12. The typo is <br />corrected on the enclosed revised page Exh-8-26. <br />45. The data for culverts C-D1, C-E1, C-F1 and the culvert at the <br />base of the gob pile was added to the Culvert Summary and <br />Minimum Size Requirements on the enclosed page Exh-8-26. <br />46. An annotation of the culvert at the base of the qob pile was <br />added on Map 20, Sedimentation Control Plan, and on Map 21-1, <br />Drainage Plans as requested by the DMG. Enclosed are revised <br />Maps 20 and 21-1. <br />