My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11961
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:16 PM
Creation date
11/19/2007 2:25:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Application Correspondence
Doc Date
10/25/1984
Doc Name
DEVELOPMENT PROGRAM TEST MINE PHASE A
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[~ECErVED <br />• • iii iiiiii-i--i-iii~ <br />ACT ? 5 i98~ <br />i9N~D LAND RS NztMAalResou~rcesON <br />C^lo. D_p <br />DEVELOPMENT PROGRAM <br />TEST MINE (PHASE A) <br />COAL RIDGE N0. 1 MINE <br />1st Quarter 1985: Mobilization of equipment, office trailer, <br />changehouse trailer, supply trailer. <br />Construction of access road, development of <br />benches on the project site, facing up portal, <br />construction of Sediment Pond A, excavation of <br />Diversion Channel A and C, upgrading of County <br />Road 335 where necessary. <br />Install temporary electrical, water supply and <br />sewage. <br />2nd Quarter 1985: Drive rock tunnels. Two tunnels will be <br />driven together, with cross cuts at approx- <br />imately 300 foot centers. Total excavation <br />time estimated to be 6-8 months. <br />3rd Quarter 1985: Continue to drive rock tunnel. Commence <br />installation of temporary surface facilities <br />such as dewatering plant, screening plant, <br />sumps, pumping station, raw coal storage. In- <br />stall flume in rock tunnels. Possibly inter- <br />sect Wheeler coal seam late this quarter. <br />4th Quarter 1985: Complete installation of surface production <br />facilities. Commence main entries for panel <br />development to the west. Production rates <br />should be 7-10,000 tons per month of coal. <br />Coal to be flumed to surface facilities as <br />preliminary flume test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.