Laserfiche WebLink
-5- <br />bl A final written report, no later then 30 days after the end of <br />that period for which Notice of Intent was filed or written <br />approval was granted. <br />c) A Drill Hole Abandonment Report, within 60 days of abandoning a <br />drill hole. <br />(THESE THREE REPORT FORMS ARE AVAILABLE FROM THE DIVISION.) <br />4) The Division may conduct periodic inspections of all coal <br />exploration ac tivlties and issue Notices of Violation to any person <br />who is in violation of the Act, or any conditions of exploration <br />approvals. (Rules 5.01.3 and 5.02.2) <br />To the best of rqy knowledge and belief, all the information presented in this <br />application is true and correct. <br />_ J isG l..~rA in ~f`GS u7~e.1T <br />Print Name a Title of Representative <br />Date: ,3-IL-$'7 <br />of Authorized Representative <br />Division Procedures: <br />1. The Division shell review the complete Notice of Intent to Conduct Coel <br />Exploration end shell make a determination within two weeks of the filing of <br />such complete Notice, whether the proposed exploration will substantially <br />disturb the natural land surface, end if so, whether the proposed activity <br />qualifies as coal exploration or surface coal mining operations. The Division <br />shall immediately notify you in writing of its determination. The <br />determination of substantial disturbance shall Include, but not be limited to, <br />consideration of the performance standards listed in Rule 4.21.4. If the <br />Division determines that the proposed coal exploration activities will <br />substantially disturb the natural land surface, you must comply with Rule <br />4.21. (NOTE: If .you feel that the activities will substantially disturb the <br />land, as 'substantially disturb" is defined by Rule 1.04, you may attach or <br />enclose your exploration and reclamation plan as it complies with Rule 4.21.) <br />2. If the Division determines that the proposed coal exploration activities <br />qualify es surface coal mining operations, the application shall be returned <br />to the person with the written determination. The person shall be informed of <br />his rights to appeal such determinations and that conduct of any activities <br />included in the application ere prohibited until a valid mining and <br />reclamation permit 15 obtained. <br />9626E <br />(Rev. 6/86) <br />