Laserfiche WebLink
~. i . • • <br />Vegetation Information - Rule 2.04.10 <br />1) The applicant must commit to collection of vegetation information for <br />developing revegetation success standards based on referenc e to a <br />historic record of conditions of the veget ation type to be disturbed. <br />In addition, a plan for collection of the vegetation data f or the <br />historic records standard must be submitted. <br />2) Based on the vegetation inventories, the s eed mix proposed for final <br />reclamation appears to be inappropriate. A revised seed mi x reflecting <br />the pre-mining vegetation composition must be submitted. A suggested <br />seed mix is given below. <br />Suggested SKM seed mix rate PLS/ac seeds/f t2 <br />Western Wheatgrass 1.75 5 <br />Graminoids Beardless Bluelanch Wheatgrass 1.5 5 <br />Streambank Wheatgrass 2.2 8 <br />Galleta 1.0 3 <br />Green Needlegrass 1.0 3 <br />Small Burnet 4.0 5 <br />Forbs Cicer milkvetch 1.0 3 <br />Lewis flax 0.5 3 <br />Northern sweethvetch 2.5 2 <br />Winterfat 2.0 5 <br />Shrubs Four-wing saltbush 3.5 5 <br />Antelope bitterbrush 8.75 3 <br />Operations Description - Rules 2.05.2, 2.05.3(1), 2.05.3(2) and 4.01 <br />1) The applicant must revise the permit application to include the <br />commitment for submission of detailed plans for escapeways and raises <br />prior to construction. <br />2) The applicant must submit revised maps showing the proposed permit <br />area, affected area, and disturbed area for Phase A and a map <br />delineating the sequence of mining during Phase A. <br />3) The applicant must clarify what the function of the water tank on <br />drawing 7-3, page 4-63 is. If this is a facility for the Coal Ridge <br />Mine, this structure must be shown on the operation plan maps. The <br />reclamation cost estimate must include removal of this structure, and <br />its function must be included in the operation plan. <br />Roads - Rules 2.05.3(3) and 4.03 <br />1) The applicant must revise the permit application to contain the <br />commitment to certification of the access road by a registered <br />professional engineer, following construction, that is given in the <br />letter dated October 25, 1984. <br />