APPCOR11826
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:09 PM
Creation date
11/19/2007 2:24:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Application Correspondence
Doc Date
2/19/1993
Doc Name
PRELIMINARY COST ESTIMATE CARBON JUNCTION MINE C-92-080
From
DMG
To
HARRY RANNEY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Carbon Junction did not bond for several ripping tasks such as the <br />temporary roads and the equipment storage area. Per the <br />reclamation plan, the main haul road will remain in place so I did <br />not bond for this task. See Tasks 9-12 for more information <br />regarding ripping. <br />I included a cost for final grading of the mine site using a 14G <br />Motor Grader. Carbon Junction did not include this task in the <br />bond estimate. Tasks 16-18 represent final grading. <br />Carbon Junction did not include a cost for reclamation of wells, or <br />structural demolition. The number and depth of wells was based on <br />your knowledge of the site. The structures on site were outlined <br />in the reclamation plan. All of these structures are portable, so <br />I did not include a cost for removing and disposing of cement. <br />These facilities are currently not located on site, so they may be <br />bonded prior to construction. <br />As you already know, the Division calculated a much higher <br />revegetation cost than Carbon Junction. This is most likely due to <br />the vague revegetation plan, as well as the cost for hydroseeding. <br />Tasks 29a-29d outline the cost estimate for revegetation. I broke <br />the tasks down by drill seeding on flat areas, broadcast seeding, <br />hydroseeding and tree and shrub transplanting. Please review task <br />29a-29d for further clarification. <br />Carbon Junction omitted the cost for mobilization and <br />demobilization and net project hours from the estimate. Refer to <br />task 30 and 31 for the Divisions estimate. <br />cc: Dan Hernandez <br />Larry Routten <br />