Laserfiche WebLink
.- :: <br />Mr. Dan Mathews -2- November 8, 1983 <br />6. Sampling of cover density within the sagebrush community: <br />Appendix F is being submitted, which is a report by Native <br />Plants, Inc. <br />7. Certification of powerline design, meeting Rule 4.18(3): <br />Figures 2.05.3(3)(b)(vi)(C)-1 and -2 are being submitted. <br />Delta Montrose Electric Association designed the transmission <br />line and Westhill Consultants designed the distribution lines. <br />8. Red Canyon ll2 portal and bench stability analysis: The sub- <br />mission of this information will be postponed until closer to <br />the need for the new mine. Some information can be found in <br />Appendix E - Additional Testing and Consulting by Rocky Mountain <br />Geotechnical being submitted at this time. <br />ADEQUACY ISSUES <br />1. Violation status: A status report covering all violation <br />notices received by the applicant is attached, Section 2.03.5. <br />2. Physical and chemical analysis of the D-seam roof coal and floor: <br />Appendix E is being submitted to cover this item. <br />3. Physical and chemical analysis of year-old refuse: Site MFR-1 <br />on Table 2.04.9(1)(b)-2 is a chemical analysis of refuse over <br />a year old and the Armstrong Engineering Report, Volume 4 of .6, <br />covers the physical properties of "weathered refuse". This will <br />be clarified with Adequacy Issues 4 and 8. <br />4. Revised soil and vegetation map, and toxic material in pond <br />excavation: Anew map and clarification of sampling location and <br />technique has yet to be completed. The "toxic" B and C horizons <br />discussion has yet to be completed. <br />5. Topsoil volume discrepancy: Yet to be completed. <br />6. Revised seed mix: A revised Table 2.05.4(2)(b)-2 is being sub_ <br />mitted. <br />7. Refuse disturbance during the term of the permit: Yet to be <br />completed. <br />8. Overburden and refuse sampling technique description: Yet to be <br />completed. <br />9.* Loadout modifications: Yet to be completed. <br />10.* Loadout air pollution control status: Yet to be completed. <br />* Discussed in the cover letter to the Draft Findings Document. <br />-continued- <br />