My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11783
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:06 PM
Creation date
11/19/2007 2:24:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Application Correspondence
Doc Name
RESPONCE TO EPA COMMENTS & REQUESTS FOR INFORMATION ORCHARD VLY MINE
From
COLO WESTMORELAND INC
To
AREA MINING SUPERVISOR & ENVIRONMENTAL PROTECTION AGENCY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • • <br />(~) <br />I <br />I <br />the Area Mining Supervisor has prepared a file memorandum con- <br />cerning mining methods and maximum economic recovery of the coal <br />resources of the tract. We are in agreement with the USGS ob- <br />seevations. The mining, plan addresses the feasi.bi.lir.v <br />of alternative mining methods (4.1.9, page 6), CWI a~;rges Lhat <br />it will investigate such methods but that its ability to use <br />longwall and shortwall methods is impaired by limitations on the <br />lease size designed to insure the integrity of t}ie short term <br />leasing criteria. As you k~iuw, Colcrado lJestmoreland Inc. <br />originally proposed recovery of an additional 5' of bottom coal <br />when pulling panels, and we will ask that the appropriateness of <br />this and other methods be reassessed by USGS when furt}ier data is <br />available. CWI is conunitted to achieving the highest recovery <br />possible and will review other thick seam mining operations in <br />other areas, which may provide additional information on potential <br />techniques to achieve increased recovery percentages. Any particular <br />technique must be suitable for the conditions present at the <br />site, and consistent with safety considerations. <br />The CWI-NIPSCO contract sets forth the amounts of coal to be <br />delivered, and CWI intends to use its utmost efforts to meet the <br />required delivery dates. <br />II. Spoil Placement and Drainage and Sedimentation Control <br />III. Maintenance of Diversion Structures <br />V. Stability of Post-mining Slopes <br />VII. Water Availability <br />I l'f i i { I <br />~~ .I i6~~I~~JiI~ L.Nd~k.~~i I, i <br />
The URL can be used to link to this page
Your browser does not support the video tag.