Laserfiche WebLink
• • III IIIIIIIIIIIII III "~~ <br />STATE OF Lv~9vi~D0 <br />DIVISION OF MINERALS AND GEOLOGY <br />pF' CO~ <br />Department of Natural Resources ~ ~.~`~,~ ~ <br />Mme,, ~ ~ <br />1313 Sherman 81., Room 215 ~ " I <br />Denver, CO 80203 ~~~~ <br />~18T6~ <br />Phone: 13031 866-3567 <br />FAX: 13031 872-8106 Roy Romer <br />October 20 1992 Governor <br />e ^nichael B. LOng <br />Division Direclar <br />Pennsylvania West Mining Company <br />c/o Mr. Greg Lewicki <br />Greg Lewicki and Associates <br />1645 Court Place Suite 309 <br />Denver, CO 80202 <br />Subject: Completeness, Coal Gulch Permit Application, C-92-079 <br />Dear Mr. Lewicki: <br />We would like to summarize our interpretation of the discussion we had this morning on <br />remaining completeness issues related to the Coal Gulch permit application. Dan <br />Hernandez and Cathy Begej agreed that the application would be called complete upon <br />the receipt of the following: <br />1. Water quality analyses of the October, 1992 samples from: <br />a. The Messier well (Cliffhouse SS) <br />b. The Mangrum well (Coal Gulch alluvium) <br />c. The Coal Gulch Mine well (Menefee formation); <br />2. Water quality and aquifer test data from the "Section 16" well; and, ~ ~ <br />•Splvv~ Fr~lc < ~Qp~w.a~., ~r~llw) .~~ <br />3. A commitment from Pennsylvania West to drill another well within 30 days of the <br />completeness date. This well would be used to obtain overburden chemistry <br />information from the roof, coal, and door strata of the proposed mine, in <br />accordance with Colorado's Guidelines on Baseline Water Quality and <br />Overburden Geochemistry data. The well would be drilled into the Point <br />Lookout sandstone, and the hole would be logged with gamma, resistivity, and <br />density equipment. The physical characteristics of the aquifers found in the hole <br />would be acquired also, per Rule 2.04.7(1)(6). <br />The Findings document for the Coal Gulch Ivtine, permit C-84-067, indicated that the <br />previous operator had agreed to drill a double completion well in the NW 1/4 NW 1/4 <br />Section 16, T35N, R10W. The staff was unable to confirm this while reviewing the <br />permit application this afternoon, as the file is now in Archives. However, the hydrology <br />files from the permit application reference a single water quality sample and two water <br />level measurements from AM-5 taken between November, 1986, and January, 1987. <br />