My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11698
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:03 PM
Creation date
11/19/2007 2:22:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
Application Correspondence
Doc Date
8/24/1981
Doc Name
PAR CONFERENCE CHIMNEY ROCK COAL FILE C-023-81
From
CHIMNEY ROCK COAL
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Long <br />Page 10 <br />Section 2.05.4 Reclamation Plan <br />1. We discussed the manner in which the Reclamation <br />Timetable, Table 1, should be interpeted. After <br />some explanation on my part, we agreed no further <br />information need be provided. <br />We will add some statement to the effect that <br />surface mining advances at the rate of approximately <br />2 cuts per year. While rough backfilling of each <br />cut occurs within 180 days followed by compaction <br />and grading. <br />Information relative to backfilling, compaction <br />and grading is presented in 2.05.3 under Overburden <br />Removal (A Seam) commencing on page 2.05-7. <br />Information which discusses soil stabilization is <br />under Topsoil Replacement commencing on page 2.05- <br />53. <br />3. Time increments will be utilized to portray the <br />sequence of events by which graded and topsoiled <br />areas are revegetated. A proposed table of these <br />events is presented below: <br />Coal Removal 2 cuts per year <br />Backfilling fi <br />Grading 180 days per cut <br />Topsoil fi Subsoil <br />Replacement within 90 days following <br /> completion of backfilling <br /> and grading <br />Revegetation within 30 days following <br /> completion of topsoil and <br /> subsoil replacement. (Except <br /> that revegetation efforts <br /> should be timed in such a <br /> manner that seeding occurs <br /> during the first available <br /> Fall following topsoil <br /> and subsoil replacement). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.