Laserfiche WebLink
<br />Page Fourteen <br />Preliminary Adequacy Review <br />GEX - Roadside 6 Cameo Mines <br />April 27, 1981 <br />2. Since the applicant has stated that a request to conduct an experimental <br />practice on the Roadside coal processing waste embankment will be made at <br />some unspecified date, a variance for delay in contemporaneous reclamation <br />according to the standards of 2.06.7 must be submitted. Also, in the event <br />that an experimental practice will not be undertaken, a comprehensive <br />reclamation plan must be submitted as an alternate plan. <br />3. The application proposes to cover both the Cameo and Roadside coal <br />processing waste banks with a minimum of one foot of topsoil. Please clarify <br />whether this means 3 feet of non-toxic non-combustible cover underlying the <br />one foot of topsoil. If this means only one foot of cover, then the applicant <br />must submit evidence that the standards of 4.15 can be met based on chemical <br />and physical properties of the waste. <br /> <br />