Laserfiche WebLink
<br />Page Eleven <br />Preliminary Acequacy Review <br />GEX - Roadside & Cameo Mines <br />April 27, 1981 <br />4. Within those areas identified as unconsolidated stream-laid deposits, <br />identify separately those areas where the vegetation suggests subirrigation. <br />5. The applicant should provide a verbal description of the regional flood <br />irrigation practices for watersheds of the same size or smaller than those <br />in the study area. For the Colorado River, describe flood irrigation <br />practices in other areas, along the same river. For tributaties to the <br />Colorado River, describe flood irrigation practices in similarly sized <br />watersheds and smaller watersheds. <br />2.07.6 Criteria for Review of Permit Applications for Permit Approval <br />or Denial <br />1. It has come to our attention that GEX Colorado rnc. is delinquent on <br />payment of the 15 cents per ton reclamation fees. GEX should be aware that <br />2.07.6(2)(0) requires that the permit cannot be issued until the applicant <br />has submitted proof that reclamation fees have been paid. <br />2.10 Maps and Plans <br />1. All maps, plans and cross-sections in the application must be verified as <br />to their accuracy. ASI maps, plans and cross-sections that come under Rule <br />2.10 directly, or by reference, sha~1 be prepared by or under the direction of, <br />and certified by, a qualified registered professional engineer or a profes- <br />sional geologist, with the assistance of experts in the appropriate field. <br />All maps, plans and cross-sections requiring certification must bear an <br />original signature. However, in order to avoid unnecessary work, only the <br />final master copy on file with the Division must bear an original signature. <br />The other copies may bear a reproduction of the professional seal. An <br />example of an acceptable method for handling map verification would be to <br />place the following statement on each original map, plan or cross-section: <br />"I certify this map is correct to the best <br />of my knowledge, as was prepared by Mr. <br />who is a qualified professional (appropriate <br />professional title)." <br />This statement can then be properly signed and stamped by the appropriate <br />registered professional engineer or the professional geologist. <br />Rule 3 Bonding <br />The applicant must provide calculations showing how the operator determined <br />the number of cubic yards of earth material to be cut and filled. <br />