My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11602
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:56 PM
Creation date
11/19/2007 2:21:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
Application Correspondence
Doc Date
9/19/1983
Doc Name
STIPULATION NOS 1 3 11 12 13 & 14 RESPONSES
From
J F SATO & ASSOCIATES
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~ERm d r co-oa ~ -s 1 <br />The emergency spillway consists of a 12 foot wide rock-lined <br />length of the embankment. The elevation of the emergency <br />spillway is only 0.33 foot below the nominal elevation of the <br />crest of the embankment. This does not provide the necessary 1 <br />foot freeboard. <br />The pond can be made to meet current requirements by: <br />(1) To allow drainage of the pond so as to meet <br />detention time of 24-36 hrs for the 10-yr 24-hr <br />event, four 1 inch diameter holes need to be drilled <br />in the standpipe. Two would be set at elevation <br />94.60 and two at elevation 95.10. <br />(2) To provide the necessary freeboard, the water <br />surface elevation in the emergency spillway at the <br />design flow must be at least 1.0 foot below the <br />embankment. Therefore, crest of the spillway should <br />be lowered to elevation 96.8 and the sides and <br />bottom of the spillway riprapped as shown on the <br />attached drawings. <br />(3) The standpipe structure should be modified so that <br />the inlet to the CMP is set just above the level of <br />the water surface equivalent to the 10-yr 24-hr <br />storm volume. This would be elevation 95.8. <br />Approximately 1.25 ft would need to be cut off the <br />existing standpipe. <br />The NPDES permit must be modified to include this pond's <br />discharge point. A copy of the letter requesting this change <br />from the Department of Health is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.