Laserfiche WebLink
10. On page 2.05.3-13 Northfield discusses the Mine Office Building. In the <br />discussion of dimensions of the building there is no height stated. <br />Additionally, the discussion states that the building will rest on stemwalls. <br />There are, however, no dimensions given for the stemwalls. Please include a <br />building height and a description of the stemwalls in the discussion of the <br />Mine Office Building and resubmit the page. If Northfield has an engineering <br />design for the building this would be helpful for bonding purposes. <br />11. Page 2.05.3-14 discusses the Bathhouse Building. In the discussion of <br />dimensions there is no height stated. Please include a building height in the <br />discussion of the Bathhouse Building and resubmit the page. <br />12. Numerous buildings, including the Mine Office Building and the Bathhouse <br />Building, state that they will use a septic system and a leach field. This septic <br />system will need to be removed/reclaimed upon final reclamation of the site. <br />Please provide the Division with detailed plans for the septic system and <br />leach field for bonding purposes. Engineering designs would be useful for <br />this purpose. <br />13. Pages 2.05.3-15 and 2.05.3-16 discuss the Crushing and Screening Plant. <br />No information, however, is given regarding the buildings concrete pad or <br />footers. Please provide the concrete pad and footer information is the <br />discussion of the Crushing and Screening Plant and resubmit the appropriate <br />page (s). <br />14. Page 2.05.3-18 discusses the Truck Scale. There are no dimensions or <br />construction given for the Truck Scale. Additionally, there is no discussion as <br />to whether there is a scale house at the Truck Scale. Please provide a <br />detailed description of the truck scale on this page and resubmit the page. If <br />there is a scale house, please include this information on the updated page. <br />15. Page 2.05.3-18 briefly discusses Topsoil Stockpiles. Please include a <br />reference of the page{s) in Section 2.05.4 where additional topsoil <br />information can be found. <br />16. Pages 2.05.3-18, 2.05.3-19 and 2.05.3-20 discuss the mine's haul road, <br />access roads and light-use roads. The pages include brief descriptions of <br />these roads. The Division, however, needs more detailed information for <br />bonding purposes. Please provide the Division with all of the road designs <br />and profiles to aid in the determination of cut and fill volumes for final <br />reclamation. <br />17. Page 2.05.3-20 of the Northfield application discusses the Power <br />Transmission Lines and Associated Facilities. There is no information, <br />however, regarding the power lines or the substation. Please include <br />information regarding the new power transmission lines at the Northfield <br />