:: • <br />2.05.4(2)(b) - Reclamation Plan - Cost Esti <br />A detailed estimate of the cost of reclamation of the proposed mining <br />operation must be included in the reclamation plan portion of the permit <br />application. The estimated cost must be in an amount sufficient to assure the <br />completion of the approved reclamation plan if the work had to be performed by <br />the Board, through independent contractors. The estimate must include <br />supporting calculations shown in sufficient detail to allow the Division to <br />verify the accuracy of the estimate. <br />2.05.4.(2)(d) - Reclamation Plan - Topsoil <br />If Section 2.05.3(5) is amended to provide a plant growth material salvage <br />narrative, the reclamation plan portion of the permit application will <br />likewise need to be revised to include a plan for removal from storage and <br />redistribution of suitable plant growth materials. If the soils information <br />gathered in accordance with Section 2.04.9 indicates that no salvageable plant <br />growth materials exist within areas to be reclaimed, an alternate plan must be <br />submitted which explains how the applicant proposes to establish sufficient <br />quantities of suitable plant growth material over areas to be revegetated upon <br />termination of operations. <br />3.02.2 - Bondin <br />Review comments for this section can be found under Section 2.05.4(2)(b) above. <br />4.06 - Topsoil <br />If Section 2.0~4(2)(d) is amended to provide a plan for removal from storage <br />and redistribution of suitable plant growth materials, the applicable <br />requirements of Section 4.06 regarding the removal, storage, redistribution, <br />and reconditioning of suitable plant growth materials will need to be <br />addressed. <br />4.25 - Prime Farmlands <br />This section appears adequate. <br />2.04.12 above. <br />Refer to the comments provided under Section. <br />jfw <br />Doc. No. 6898 <br />