Laserfiche WebLink
<br />Mr. Ken Schlegel <br />Page -4- <br />AuyusC 31, 1979 <br />pipe and culverts. Design calculations used for determining sediment <br />yield runoff volume and peak flows should be provided. Drainage a%^trols <br />should be designed consistent with the final federal regulatory program. <br />h+hat chance is there that flooding in Hubbard Ck could wash out the lower <br />sediment or coal/refuse stockpile mitigation measures? <br />EXHIBIT I SOILS <br />The general soils information provided by SCS is helpful. Ho~:iever, given <br />the prier disturbance at the mine, Che original soils for the bench, <br />haul road and corral (?) have been altered, drastically. Therefore, soils <br />reconstruction will have to be undertaken during the reclamation phase. <br />In order to knoi+ beforehand the range of suitability constraints+ahercnt <br />in the soils reconstruction operation a site specific program of soils <br />analysis will have to be undertaken. Stratified sampling at not feo-u,r <br />than four representative sites doimslope of the mine bench should be ini- <br />tiated, immediately. Surface soil samples beloo-c the haul road should be <br />taken from at least 2 representative sites. A control sarnple of undisturbed <br />A & 6 soil horizons should be taken near the mine bench and analyzed. <br />Parameters analyzed should be those o-;e discussed by phone. A sae~ple should <br />also be taken of the soil which is to be imported from the Asher Farm. <br />EXH1UlT J VEGETATION <br />Site specific vegetation information should be provided for all affected <br />areas. Use adjacent undisturbed areas in the inventory. The seed mixtur:~ <br />and shrub tree plantings in the reclamation plan should correlate with this <br />inventory. <br />EXHIBIT I <br />When ctll adequacy issues have been satisfactorily addressed we will revie~~~ <br />reclamation costs. <br />INTEP,IN P.EC,ULATORY PROGP,AM <br />717.14-see exhibit E. Also a rather detailed discription as to ho~•i the <br />final grading mill approximate original contours should be provided. <br />717.14- Will re Fuse material be generated in sErening or crushing activ- <br />ities. Unless refuse areas era designated and properly designed no sur- <br />face disposal will be allowed. <br />817. - see exhibit G, Drainage Control. <br />The NPDES permit may have to be animended to include another discharge <br />point for the lo~:c•r sediment pond. Detailed design calculations and dia- <br />grams for sediment yield, runoff volume, peak flows, as well as deten[ion <br />time and dewatering and spill•::a'y systeoi; should be provided. Dam and im- <br />poundment design specifications should be provided. In general, this <br />section on Exhibit G should shrn•+ ho~.i the regulations will be niet rather <br />than simply state that they will be satisfied. Again it is the final <br />(cont'd) <br />