Laserfiche WebLink
:I k • <br />_2_ <br />7. Removal of metal shop building (assume 3,000 yd3) @ 17.89/yd3 <br />(Engelsman's General Construction Cost Guide) results 1n a total of E23,600.00. <br />8. Reclamation of sediment ponds at Pits 2 and 3 will probably entail some <br />haulage of overburden from Pit 4. Assume total volume of 450 yd ,and <br />average haul distance of 10 miles round trip. A Mack M25X truck with a 16 <br />yd3 struck capacity would require 28 trips. Assuming 1 hour travel time, <br />approximately 13 yd3 would be moved each hour (50 min hour). 35 hrs x <br />E73.00/h r. = E2,555.00. <br />Two D8K Dozers and operators for 35 hours would total 57,140.00 <br />Revegetation of approximately 5 acres @ 2618.00 per acre would total 53,090.00. <br />Total pond reclamation = 513,000.00 <br />Summary <br />Pit 4 Reclamation <br />Pit 6 Reclamation <br />Pits 1, 2, 3 and 5 Reclamation <br />Shop Removal <br />Sediment Pond 2 & 3 Reclamation <br />E568,270.00 <br />12,391.00 <br />f 58,277.00 <br />E 23,600.00 <br />S 13,000.00 <br />Sub total <br />TOTAL (with 10X adm. cost) <br />/th <br />Doc. No. 0567 <br />E675.538.00 <br />E743,000 (rounded off) <br />