Laserfiche WebLink
<br />~~r;~c~rrr~u <br />TAB 13 -RECLAMATION PLAN JUN 1 01985 <br />COMMENTS ON CHANGES REQUIRED BY MINED LAND <br />TIE-ACROSS REALIGNMENT RECLAMATION DIVISION <br />The primary change required by the tie-across realignment is a revision of Exhibit 13-4 <br />"Post-Disturbance Vegetation -Tie-Across Haul Road." The original permit area has <br />been modified to more accurately reflect the disturbances due to topsoil stockpile loca- <br />tions, road construction disturbance, and grading disturbance required for final reclama- <br />tion. An effort was also made to refine the seeding areas for the various mixes. <br />Reclamation methods, seed mixes, and standards of reclamation success are as previously <br />presented in Tab 13 - Postmining Land Use, Seneca II-W Permit Application. <br />