My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11284
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:39 PM
Creation date
11/19/2007 2:19:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Application Correspondence
Doc Name
LORENCITO CANYON MINE PERMIT REVISION EXHIBIT 7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Mr. Kent Gorham <br />July 26, 1997 <br />Page 2 <br />66. Crest elevations of the fills aze at the same elevation of the lowest coal seam mined at the <br />~l/''r surface mine. LCC has delineated the O seam and the OI rider seam outcrops on Map <br />2.05.4-t for use in your review. <br />~Q,, 67. The Post-Mining Topography Map submitted July 1, 1997, resulted in a final reclaimed <br />`I /~ configuration which had gentler slopes in the fills as well as in the mined out azeas. These <br />,~//\Q slopes are 3: I or gentler from the proposed ridge top to the edge of disturbance in the valleys. <br />~b~` The geotechnical discussion associated with the future submittal of a revised Exhibit 13 will <br />address the general stability of the azeas overlying the fills and achievement of a safety factor <br />of 1.3 or greater. <br />Q~ 68. LCC has informally provided modifications to Figures 2.05.2-2 and 2.05.2-3 (Cross-sections <br />A - A' and B - B') and has modified Map 2.05.4-1 to show the azea requested for a variance <br />in contemporaneous reclamation. These aze formally provided for incorporation into the <br />permit application. In addition, a description of a contingency reclamation plan was <br />provided to your staff, as well as representative modified bond calculations. <br />~69. Page 2.05-10 has been modified as requested to clarify, in the Division's perspective, the <br />. location of the barrier berms. This has been backed up by delineation of the barrier berm <br />locations on Map 2.05.4-I. <br />^n5~ ~~~. LCC acknowledges that storage of coal waste underground needs to be preceded by MSHA <br />1v' approval and accepts a stipulation requiring submittal of such an approval prior to engaging <br />~a',~ ~~~ in such activity. <br />(~ 73. This question will be addressed in a future submittal. <br />v~ 75. Map 2.05.3-1 has been modified to reflect the location of the three portal substations. The <br />~~b~ description on page 2.05-13 describes support facilities found at all three portals rather than <br />at a single site. <br />~ 76. The design for the loadout pond has been modified and changes made to Exhibit 15~. <br />~ Designs for SAE sumps at the train loadout can be found in Exhibit 15-16, SAES. Page <br />2.05-33 has been modified to reflect the use of the sumps. <br />78. Page 2.05-13 was revised to omit discussion of a sewage treatment plant per the July 1, 1997, <br />a(~- response to questions 51 and 78. Use of a bath house facility will be supported by a septic <br />system. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.