Laserfiche WebLink
July, ~ust - one flight each month <br />The final study plan should be reviewed and approved by the DOW. <br />2. The disturbed area must be reclaimed with aspen and shrub species <br />present now on the site. <br />3. The site must be reclaimed as contemporaneously with mining as <br />possible. - <br />~. A physical buffer zone of fifty feet from the edge of the hill must <br />be left undisturbed. <br />k'e agree that based on new data gathered by Eneigy Fuels, this lease <br />can be modified to include the elk buffer zone currently excluded. <br />Z'his would require application of an exception under Unsuitability <br />Criteria 15. Tliis has been agreed upon by DOb: in their 7/1 letter. <br />Tl~e stipulations are acceptable to us. If they are enforceable, they <br />should be included in the modification, if approved. <br />i:e can proceed ~:}~en the application for modification is received. <br />