My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11230
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:37 PM
Creation date
11/19/2007 2:18:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Application Correspondence
Doc Name
EMPIRE ENERGY CORP PERMIT APPLICATION FN C-044-81
From
MLRD
To
EMPIRE ENERGY CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WCat i:i li +n DOCIImLnt il~~~U 'i red I~ellll'd 131 Step$ <br />Sectioc 4.b.2.4, Include statement that "par°tial <br />Py. IV-139, extraction" will be conducteu <br />Sew nu ?arayraph oeneath the private residence. <br />Section 4.6.2.5, Include statement that "partial <br />Py. IV-139, extraction" will be conducted <br />Fifth Paragraph beneath the oil pipeline. <br />Section 4.6.2.11, Empire Enet°gy Corporation shall <br />Py. 1V-144, clearly state that "partial extraction" <br />S(:c and Paragraph Cechniyues will be utilized eve rywnere <br />'within the "L'UI~FI[R LUNLS" uidicatud on <br />Map iV-l. <br />section 4.u.Z.4.[;, Th.: applicant shall include tha <br />`'y. IV-186, o-lilliams Fork and Yampa Rivers in <br />First Paragraph the statement of areas to be prut~cted <br />through "partial extraction" <br />techniques. <br />Un page 1V-177 the applicant states that "no material damage ~.+ill r;sult <br />from planned subsidence at Empire Energy's Eagle Paine Complex to <br />structures not owned by Empire Energy ur renewa~le resource lands <br />exisci-~y in the mining area not exempt from the performance standards". <br />The second part regarding renewaole resources lands that are not exe~rpt <br />from performance standards shall be removed from 'the permit <br />application. The applicant is nut exempted from any perfur~rance <br />standarus. (This is stated in Ed uischoff's letter to Andy Schissle~, <br />Feoruary 4, 19S'l.j Empire Energy :orporation is yrandfathared out or <br />prohi~ition of ;nininy but nwst complywith the subsidence performance <br />standards. <br />En~pire uieryy Corporation is required to survey monitor the six <br />potentially effected residential structures, in accordance with Rule <br />2.U6.6(6)(c)(i)(C). The applicant included a conunitn~ent to perfor~o the <br />required monitoring ~,+ithin its response to adequacy review subaritted on <br />July 2U, 198U. Empire Energy Corporation has faileu to include the <br />amended commitment within 'the final permit application document. This <br />survey rnonitoring shall be performed. <br />Tile cescription of monument insta llation on page IV-19o shall oe <br />typographically corrected to r2 ad `hat the holes :;ill oe ,i:.~~e;ed ~o <br />c~ceatn the "frost" line. In addition, the applicant shall ...~l,;de <br />r:itnin the permit application document the typical monument d~scri~tion <br />and sketch submitted to the Division on September 15, 1931. <br />
The URL can be used to link to this page
Your browser does not support the video tag.