Laserfiche WebLink
-c,- <br />nll. ~.1'L~Hlliii;:i UESCIi1PTi(1N - II~JLtS [.'~:r.Z, L.US.::(1), '1.05.:;(2j alid 4. U1 <br />.;.:1TICAL CONCERNS - <br />These concerns must ue resolved prior to permit issuance. <br />On payes IV-b0 reference is made wit~iin the amended application to she <br />issuance of an "Activity Permit". P.ny permit issued by the Division tiiuuld <br />include an approval of a speciFic DperaLions plan, includiny cpecific <br />proposed mine workinys confiyuration. Tirniny variations may :,c caused uy <br />conditions ueyond the operator's control, and are appropriately the <br />subject nti revisions. However, the approved nnine plan confiyur,.tion ~,aust <br />:,~ FollDwud, unless an apprupri•:Ce revision has been properly appruv~rJ, in <br />ddvanr,~, by Che IJivisiun. <br />Un pageslIl'J-4J to IV-50A, reference is IaarJe uy the aPplican~ to possi,ule <br />future u~iyliyntiny or a "L-Wes C" ven.ilation portal at some unpredic:ablc <br />location. All surface disturuances are requirerJ to ue permitted prior tD <br />construct .on or excavation. Empire tneryy Corporation must prD~ide <br />appropriate typical design fora "worst case" situation, at a ~ninimura. <br />Pot~nti~l portal locations must be yeotuchr~ieal~y investiyated ,;nd <br />analyzei: to determine whether any problematic areas exist within which the <br />portal i,~stallation should be precluded. <br />aaJ 1~-. '~USt be aGlB nded LO deplCt the entire propo ie0 r,llne 1.1 art For ti"IE <br />No. 5 nine. In its current Form, the map omits a major portirn of the <br />south~~est portion of the proposed mine plan and permit areas. Topographic <br />cuntouri.~g is not even depicted in the entire area contained un the <br />current ~.wp. Without the topoyraphic contouriny within the "[-::est" .,.ain <br />area of the No. 5 mine, it is impossible to determine surface <br />configuration within the area proposed for possible day:iy'nting <br />operations. Empire Encryy Corporation shall suumit a revision to the <br />per~ait o-,i.en the location has ueen t1c:i;er~IllnLd. <br />nIII. MINE rACILIFIES, ROADS, PONDS, I;•1PUUNUf~7ENTS, UIVEKSIONS ANU COAL <br />~ - KULLJ C. U5. 3131, L. U5. 314), L. U5. 31r1. 4.U3, 4.U4 do <br />STIPULHTIUNS - <br />Thusu concerns cuulu lie stluulalud as conditions to Che pcr,niC. <br />On page IV-:,7 and i'J-b2, reference is made to construction or "~nc "iin <br />oFFice co::plex". blap IV-l~ shor;~s a site plan for ofFices, sncp, bathouse <br />and ware~~ouse, anu ~~lap IV-c snows the lOCatlOn Of d "Possible Future <br />Office Site". Without amore definite com~nit~nent to the location ane <br />CDnSt rUCtlCn of tnis site, Description of tale environmental resources to <br />oe distr.roed, and reclamation cost estimates, the construction or tnis <br />complex c,;nnot be approved as part of the permit document. E~:.~ire ~.te n;~ <br />Corpuruti~~a ;hill suU;nit r revision to Lhe permit ahplicatic„ rur apprc:ul <br />uy the Uivision. <br />