Laserfiche WebLink
<br /> <br />Mr. Anthony J. Waldron -2- April 11, 1996 <br />Division of Minerals And Geology <br />migration of big game animals does become a problem we will request that another location for crossing the <br />conveyor belt be developed and installed. During my meeting with Mr. Beaz, he stated that if this problem <br />with crossing the conveyor does occw he will be willing to consider and install the additional crossing. The <br />additional crossing of the conveyor belt would need to be placed about half way between the two current <br />locations (the upper overpass and the lower underpass). <br />Thank you for considering our comments regarding this proposal. <br />Sincerely, <br />~~~~ <br />Kirk Madariaga <br />District W"ddlife Manager <br />PO Box 426 <br />Paonia CO 81428 <br />(970)527-4419 <br />cc: Jim Young -DOW, Gunnison <br />Rick Sherman -DOW, Montrose <br />Basil Beaz -Bowie No. ]Mine <br /> <br />