My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11197
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:36 PM
Creation date
11/19/2007 2:18:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
Application Correspondence
Doc Date
6/11/1984
Doc Name
APPLICATION (1984) COAL MINING PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03.5 Compliance Information <br />(1)(a) not applicable <br />(b) no forfeitures <br />(2) not applicable <br />(3) Notice of Violations - one - #80-5-16-3 <br />Date of Violation - July 23, 1980 <br />Issued by - United States Department of Interior <br />Office of Surface Mining reclamation <br />and enforcement <br />Violation - Mining without a Permit <br />No judicial proceeding - application is now being <br />compiled for submission <br />2.03.6 Right of Entry and Operation Information <br />Quick claim deed - microfilm # 422488 <br />( see attached document ) <br />2.03.7 Relationship to Areas Designated Unsuitable for <br />Mining <br />(1) THE BLUE FLAME COAL COMPANY <br />area designated unsuitable <br />mining activities under 30 <br />study for designation in an <br />proceeding initiated under <br />(2) not applicable <br />(3} not applicable <br />is not within an <br />for underground <br />CFR 764 or under <br />administrative <br />that part. <br />2.03.8 Permit Term Information <br />(1) not applicable <br />(2) Anticipated starting date - June 1, 1981 <br />Termination date - unknown, approximate ter- <br />mination date will be mid-summer 1986. <br />Horizontal penetration will not exceed <br />1500 feet from the surface entrance. <br />Vertical depth shall not exceed 300 feet <br />from above ground surface to coal seam floor. <br />Coal will be mined by underground mining using a <br />room and pillar methodology. There is no auger or <br />surface mining involved. The mine plan will consist <br />of entries being driven in a westerly direction. <br />Panel development will take place as per the USGS <br />Mine plan. As per USGS Mine plan, room and pillar <br />sections will be fitted into development and pro- <br />duction schedule in keeping with roof safety, ventil- <br />ation and coal recovery methods. <br />(3) not applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.