Laserfiche WebLink
<br />fertilizer via broadcast. 'T'his will be done in the late spring. <br />The fertilizer will be a mixture of 1~0~ nitrogen and 60~ phosphate. <br />RECLAMATION TIttE TABLE <br />Activit-~, Time Period <br />1. Dismantling surface facil- <br />ities-sale d'salvabed equip- <br />ment and coal stockpile, as needed <br />backfilling and sealing cf <br />nine portals <br />2. Regrading of the permit <br />area 3 weeks <br />3. To}~ soil dispersement <br />compacting, roughing 2 weeks <br />4. Seeding and nulching with <br />erosion control blanl~:et 3 weeks <br />5• Planting shrub mix and trees 1 week <br />6. Fertilization <br />7. 'rlaterirg, erosion control, <br />inspection., and mainter_ance <br />of diversion channels continuous <br />8. Re-seeding after spring runoff '. <br />(if necessary), removal of diver- <br />sion channels <br />