Laserfiche WebLink
<br />_lU_ <br />XIX. Mine Facilities, Coal Handling Structures, Support Facilities - <br />Rules 2.05.3(3). 2.05.3(7 and 4.04 <br />In light of the changes tha have occurred at the mine since the latest <br />submission of permit application materials, the application must be <br />modified with respect to the current situation at the mine site. Uetail <br />must be provided with respect to the explosive storage area and the shop <br />area near Pit No. 5. Primarily building dimensions, construction <br />specifications (foundation type) and drainage control must be provided at <br />a rninimum. At this time the Division cannot find the operation in <br />compliance with the requirements of this section. <br />XX. Roads - Rules '1.05.3(3) and 4.03 <br />Haul road construction details, profiles, typical cross sections and <br />drainage desiyns are provided for the Pit 4 haul road. Uesign drawings <br />and construction and drainage details are not provided for ocher proposed <br />haul roads. No infonnation is provided for pre-existing roads. <br />For pre-existing haul road segments, as indicated on the mine plan <br />map, the applicant should submit information required by Rules <br />2.U5.3(b)(i) B, C, and D regarding current status, construction <br />dates and compliance with design standards of Rule 4.03. <br />2. For additional haul roads to be constructed this permit term, <br />(other than the Pit 4 haul road) infonnation on design, <br />construction and drainage as specified by Rule 2.U5.3(3)(c) must <br />be submitted. <br />3. The application states that; based upon the landowner's request, <br />haul roads will remain followiny mining and reclamation. The <br />usefulness of the main haul road and the Pit 4 haul road with <br />regard to providing access to the property is apparent. The <br />justification for the short road segments which provide access to <br />Pits 5, 7, and 8 is not apparent. These road segments should be <br />reclaimed, unless the landowner specifically requests that they <br />remain. <br />XXI. Bondinv - Rule 2.U5.4(2)(b) and Rule 3.U <br />Additional infonnation is required to properly calculate the amount of <br />bond required. The amount of overburden and topsoil removed during <br />initial cuts and stockpiled at each pit must be provided. Since <br />backfilliny and grading and topsoil redistribution will be following <br />mining operations contemporaneously the worst case would be replacement <br />of stockpiled materials only. The application must be specific with <br />respect to the volumes of material stockpiled. <br />The status of re vegetation at Pits 1, 2, and 3 must be described in <br />greater detail. The Uivision will require sufficient funds to revegetate <br />these areas in case of failure of recent efforts. <br />