Laserfiche WebLink
~ Eight <br />Section 2.06.10 Coal Processing Plants and Support Facilities not Located <br />Within the Permit Area <br />1. At this time the Division is not in a position to make a determination <br />concerning juristiction over the DeI Norte Land out facility. The <br />applicant will be notified as soon as a decision is reached. It should <br />be noted that if the Division does claim juristiction, all information <br />necessary to demonstrate compliance with Rule 4.28 must be submitted <br />and section 2.06.10. <br />