Laserfiche WebLink
r <br />_ ___ _ <br />S I /. t L OI CUl O1: Af)O NII nANI~ U. I nrSM ~uwnmrv III III III III IIII III1 <br />DEPARTMENT OF NATURAL RESOUACES 999 <br />O. Monte Pascoe, Executive Director <br />1V11NEll LAND RECLAD9A'TION <br />423 Centennial Building, 1313 Sherman Street <br />Denver. Colorado 60203 Tel. (303) 839-3567 <br />David C. Shelton <br />Director <br />April 27, 1981 <br />Mr. Rade Orell <br />Chimney Rock Coal Company <br />P. O. Star Route Box 52A <br />Pagosa Springs, Colorado 81147 <br />Re: Martinez Strip - Our File No. C-023-81 <br />Dear Mr. Orell: <br />The purpose of this letter is to convey to you certain preliminary concerns <br />which have been identified in the MLRD review of your application referenced <br />above. This report constitutes the 60-day notification of preliminary <br />findings as to the substantive adequacy of your application, pursuant to <br />CRS 1973, 34-33-118(5), as amended. I would like to stress the preliminary <br />nature of this report, as the review of your application cannot be completed <br />without the benefit of additional information. Additional comments will be <br />forthcoming as our review progresses on the issues raised in this preliminary <br />report, and on other issues as they arise. <br />All responses to deficiences identified in this review, and any other re- <br />visions or modifications you want to make to the permit application, must <br />be submitted as revisions to the existing application, not as additional <br />submissions. In order that the Final permit document will remain as compre- <br />hensive and concise as possible, all revisions should be prepared in a manner <br />that will facilitate their insertion/substitution in the existing application; <br />this must be done for all 6 copies (MLRD - 5, county clerk - 1). <br />In order that we may have adequate time to review your responses to the <br />deficiencies identified in the enclosed review and incorporate the results <br />of this new material into the written findings the Division must make prior <br />to issuence of a permit, it is essential that Chimney Rock Coal respond as <br />expeditiously as possible. The time schedule we are currently working under <br />requires that the Division issue a proposed decision by June 18, 1981. If <br />Chimney Rock Coal submits a complete and adequate response package by May 22, <br />1981, the Division would most likely be able to complete its review within <br />the time frame specified in the Colorado Surface Plining Control and Recla- <br />mation Act of 1979. <br />If you have any questions regarding this review, feel free to call me. <br />Sincerely, <br />Michael Long6'l/~,C, /~ <br />Reclamation Speci ~t <br />ML/ej <br />Enclosure <br />