My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10945
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10945
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:29 PM
Creation date
11/19/2007 2:16:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Application Correspondence
Doc Date
2/16/1993
Doc Name
HG LOADOUT APPLICATION C-92-081 PAR RESPONSE
From
DMG
To
STEVE WATHEN LARRY ROUTTEN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Contractors Profit and Overhead (10.5% of Direct Cost)- <br />The Division uses the value of 10% of the direct reclamation cost <br />total to determine contractors profit and overhead. Peabody can <br />use 10% rather than 10.5% in the bond estimate. <br />5. Reclamation Management fee (5.2% of Direct Cost)- See Net <br />Project Hours. <br />6. Public Liability Insurance (1.550% of Direct Cost)- The <br />Division calculates the public liability insurance at a rate of <br />1.550% of the direct cost. Please include this liability insurance <br />in the bond estimate. <br />7. Contractor's Performance Bond (.975% of Direct Cost)- The <br />Division calculates the contractors performance bond in the <br />reclamation cost estimate. This percentage is .975% of the direct <br />cost of the bond estimate. Please include this cost in the bond <br />estimate. <br />This concludes the Division's review of Peabody's performance bond <br />estimate for the HG Loadout Facility Mine. <br />Section 2.05.4(2)(c) Backfillinq and Rough Grading <br />Section 2.05.4(2)(c) states that Peabody is required to produce a <br />plan for backfilling and grading the proposed permit area. The <br />Division needs appropriate cross sections that are typical and <br />represent the final surface of the proposed permit area. <br />Please submit to the Division an appropriate cross section of the <br />existing and final surface configuration of the proposed permit <br />area in accordance with Section 2.05.4(2)(c). <br />
The URL can be used to link to this page
Your browser does not support the video tag.