foreman and vehicle totals $25.46/hr. The Division feels that <br />$19,867.00 is a reasonable estimate for the job superintendent. <br />Please change the bond estimate to reflect this cost. For further <br />clarification regarding net project hours, please see the attached <br />cost report. <br />Miscellaneous Reclamation Tasks <br />There are a few reclamation tasks omitted from Peabody's <br />performance bond estimate. They are as follows: <br />1. The Division's current policy is to bond for removal of <br />50% of the total coal stockpile. Peabody is in the process of <br />permitting 50,000 tons of coal to be stockpiled on the HG Loadout <br />mine. Please include a cost for removing the coal from the site to <br />be disposed in the appropriate manner, or calculate the cost for <br />disposal on site. Peabody is required to submit a reclamation plan <br />for roughly half of the coal stockpile being 25,000 tons. Please <br />include this in the estimate. <br />2. Please state whether any monitoring wells or exploration <br />holes within the permit area need to be sealed or plugged. If so, <br />please include a cost for sealing and plugging such wells. <br />3. Please include a cost for maintaining the site over the <br />10-year liability period. Such costs should include rill and gully <br />repair and other maintenance items. <br />4. In the permit application, Peabody stated that 5280 feet <br />of fencing would be placed around the reclaimed area. Using MEANS <br />1993 edition, the Division feels that an appropriate cost for a <br />five foot fence is $7.90/lin.ft. Please include this cost in the <br />estimate. <br />Indirect Costs <br />The Division reviewed the indirect cost prepared by Peabody and has <br />the following comments: <br />1. Mobili2ation/Demobilization- See above <br />2. Contingencies (10% of Direct Cost)- The Division of <br />Minerals and Geology does not include contingency fees in the <br />estimate. Peabody can omit the 10% contingency fee from the bond <br />estimate. <br />3. Engineering Redesign Fee (7% of Direct Cost)- The <br />Division calls this the Contractor Preparation Fee using a rate of <br />4.25% of the direct cost and the total of the indirect cost. <br />Peabody can lower the 7% fee to 4.25% of the indirect and direct <br />total of the bond estimate. <br />