Laserfiche WebLink
<br />2.04.6(2) (a) (V) <br />Slouging of road cuts and face ups will be controlled by <br />commonly accepted, state of the art construction techniques, <br />erosion controls and maintenance <br />This is discussed appropriately <br />in the text. <br />2.04.7 <br />1. Sections 4.2.3 and 4.2.4 were rewritten and Figure 4.2-2 <br />redrafted to clarify a distinction between the 'six (6) baseline <br />monitoring wells and the wells proposed for future monitoring. <br />All six (6) baseline monitoring wells have been accurately <br />located on Figure 4.2-2 along with the locations of the four (4) <br />monitoring wells that will be used for monitoring during opera- <br />tional activities. <br />2. Tables 4.2-1 through 4.2-5 have been appropriately modified <br />to show water levels realized during groundwater sampling. <br />3. Page 4-12 was changed to clarify that the "exposed" formation <br />exhibited no "yields" of groundwater in the form of springs or seeps. <br />The lack of aquifers is elaborated upon and statements made in the <br />text to the effect that the mining activities will not impact <br />aquifers. <br />4. Evaluation of all exploration boreholes formed the basis for <br />the statement on page 4-13. Additional field and "E" logs were <br />provided in Appendix G. <br />