My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10883
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:27 PM
Creation date
11/19/2007 2:14:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Application Correspondence
Doc Date
12/10/1984
Doc Name
GRASSY GAP BONDING CALCULATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />• • <br />GRASSY GAP MINE, BRUEGGEN PIT (No. 4) <br />Anticipated Final Backfilling ~ Topsoiling Costs <br />Assume 250,000 C.Y. of subsoil and 45,100 C.Y. of topsoil <br />Stockpile to backfill and topsoil area respectively <br />Maximum haul = 2000 L.F. (Most likely haul under 1000 L.F.). Average <br />elevation 7500. Avd. grade = 8°!,. Spread of equipment composed of <br />Cat 6310, Scrapers, Cat D-9L & Cat D-8K Tractor Dozers, Cat 14C Pfotor <br />Grader. <br />All calculations based upon information contained in Caterpillar Performance <br />Handbook, Edition 12. <br />Rolling resistance estimated from table page 501 = 5% <br />Altitude operating from Table Page 504 = 100% <br />Total effective grade loaded = 8% grade <br />Assistance - S% rolling resistance = 3% favorable <br />Total effective grade empty = 8% + 5% = 13% unfavorable <br />For loaded [ravel time: <br />From retardar curve, page 186 with 3% effective grade and 75,000~i <br />loaded scraper, speed = 31 MPH. <br />Haul travel time, therefore = <br />2000 Feet = .73 Min. <br />31 MPH (88 FPM/MPH) <br />For empty travel time: <br />From travel time curve, page 188 with L3% total resistance and 2000 <br />for haul <br />Return travel time, threrfore = 2.3 Min. <br />Pusher - Scraper combination: <br />From page 449 <br />Boost time = .10 Minutes <br />Return time = 40% of load time <br />Maneuvering time = .15 Minutes <br />Pusher cycle time = 140% of load time + .25 Minutes <br />Load time from chart page 166 = .6 Minutes <br />Pusher cycle time = 1.4(.6) + .25 = 1.09 Minutes <br />Scraper cycle time = load + haul + maneuver b spread + return <br />Maneuver and spread time from page 166 = .7 Minutes <br />Scraper cycle time = .6 + .73 + .7 + 2.3 = 4.33 Minutes <br />Number of scrapers handled by each pusher = 4.33 Min. = 3.97 or <br />1.09 ?Sin. 4 scrapers <br />
The URL can be used to link to this page
Your browser does not support the video tag.