My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10867
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:23 PM
Creation date
11/19/2007 2:14:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Application Correspondence
Doc Date
10/26/1984
Doc Name
RESPONSE TO DRAFT FINDINGS & STIPULATIONS
From
STORM KING MINES
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~ <br />A) submit a certification statement from Chen 6 Associates <br />certifying authorship of all Chen documemts and amendments <br />thereto, <br />B) amend the engineering design as necessary or submit other <br />data to prove a seismic safety factor of at least 1.2, <br />C) submit a schedule for visual inspection of coarse refuse <br />material and performance of point-load tests on compacted refuse <br />with mutually agreeable criteria, and also meet CMLRD required <br />commitments to in-place testing of site soils, <br />D) revise the proposed collector drain and/or blanket drain <br />design to meet technical requirements, <br />E) commit to certifiably satisfactory embankment slope <br />stability, <br />F) commit to an on-going refuse testing program as required, <br />G) ultimately complete a detailed design plan to be approved by <br />CMLRD and its advisory agencies. <br />11) Ref: Roads - Rules 2.05.3(3) and 4.03 <br />MLR Comment: <br />"The Roads Section in Volume I, Section 4, and the Road Drainage <br />Section in Volume VI of the application were reviewed for <br />compliance. <br />The applicant proposes to construct an access road to the surface <br />facilities which will be temporarily used as a haul road until <br />the proposed railroad is constructed; a haul road from the <br />surface facilities area to the coal refuse embankments; and <br />several light use roads along the pipeline corridors transmission <br />line corridor; and monitoring sites. <br />The applicant proposes to retain the <br />part of the post-mining land use. <br />4.03(1)(f), retention of the roads <br />Division if the landowner requests <br />Therefore, the following information is <br />Requirement No. 9 <br />access and haul roads as <br />In accordance with Rule <br />can be approved by the <br />that the road be left. <br />necessary: <br />PRIOR TO APPROVAL OF THE HAUL ROAD AND/OR ACCESS ROAD, THE <br />APPLICANT MUST EITHER: 1) REVISE THE APPROVED APPLICATION <br />WITH A WRITTEN REQUEST FROM THE LANDOWNER(S) THAT THE ROADS <br />OR CERTAIN PARTS THEREOF ARE TO BE LEFT OPEN FOR FURTHER USE: <br />OR 2) REVISE THE APPROVED PERMIT APPLICATION WITH A DETAILED <br />RECLAMATION PLAN FOR THE ROADS." <br />SRM Response: <br />
The URL can be used to link to this page
Your browser does not support the video tag.