My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10867
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:23 PM
Creation date
11/19/2007 2:14:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Application Correspondence
Doc Date
10/26/1984
Doc Name
RESPONSE TO DRAFT FINDINGS & STIPULATIONS
From
STORM KING MINES
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />will have precedence over those of the mine; however, with <br />proper management and storage, both uses can be satisfied even <br />during periods of low flow. <br />6) Ref: Topsoil - Rules 2.04.9. 2.05.3(51. 2.05.4(2)(d) and <br />4.06 <br />MLR Comment: <br />"Baseline soils information and the topsoil removal and <br />redistribution plans in Volume I, pages 3-109 to 3-123 and 4-65 <br />to 4-68 and Volume II, Appendix 3.5-1 were reviewed for <br />compliance with the regulation. <br />Topsoil will be salvaged from all areas proposed to be disturbed <br />and placed in topsoil stockpiles. The location of topsoil <br />stockpiles for the coal refuse impoundment are shown on map <br />3.5-1. The applicant did not indicate where topsoil from the <br />surface facilities area will be stockpiled due to potential <br />requirements for visual barriers by Garfield County. Therefore, <br />the following stipulation is necessary: <br />THE PERMITTEE MUST SUBMIT A PLAN TO THE DIVISION SHOWING <br />WHERE ALL TOPSOIL SALVAGED FROM THE FACILITIES AREA WILL BE <br />STOCKPILED. THE PERMITTEE MUST OBTAIN DIVISON APPROVAL OF <br />THIS PLAN PRIOR TO ANY DISTURBANCE." <br />SRM Response: <br />Topsoil salvaged during Phase "A" development will be stockpiled <br />in large berms to provide visual barriers between existing and <br />proposed surface facilities and off-site viewers. These topsoil <br />stockpiles will be located as shown on the revised version of Map <br />3.5-1. This revision should eliminate the need for stipulation <br />No. 7. <br />MLR Comment: <br />"The soils resource information shows that the applicant has <br />insufficient topsoil at the coal refuse impoundment area to meet <br />the requirement of Rule 4.10.4 for replacing four feet of cover <br />over the coal refuse. The applicant proposes to strip additional <br />material as non-toxic, non-combustible cover following topsoil <br />removal. The topsoil will be stored in two stockpiles and the <br />overburden will be in one stockpile, all above the coal refuse <br />impoundment. Several deficiencies still remain in the topsoil <br />salvage plan at the coal refuse impoundment which must be <br />
The URL can be used to link to this page
Your browser does not support the video tag.