My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10826
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:21 PM
Creation date
11/19/2007 2:13:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
Application Correspondence
Doc Date
12/12/1983
From
TWIN PINES COAL CO INC
To
DNR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Twin Pines from L. G, White, Dec, 6, 1983 Page 2 <br />Statement from Phil Kessler, 440 Railroad, Rockvale, C0: <br />Mr, Kessler wa employed at Caldirola No, 2 from 1959 to 1962 as <br />the hoist open or, He was also responsible for pumping the sump <br />at the bottom c the slope, Mr, Kessler stated that almost all of <br />the water in tt mine came from a spring in the slope above the <br />sump which was ..pslope from a roll in the coal, He felt the <br />difference in e_evation through the roll was about six (6) feet, <br />While employed at the mine, he pumped the upper sump every day, <br />He stated that the water in the lower portion of the mine was only <br />pumped once every one to two weeks, <br />Statement from Joe Caldirola, 700 E, Main Street, Florence, C0: <br />Mr, Caldirola developed Caldirola No, 2 Mine, He stated that a <br />spring was encountered while driving the rock slope into the mine, <br />causing considerable trouble, He said they had to drive a sump <br />at the end of the slope to alleviate the problem, and control the <br />water, He confirmed the presence of a roll in the coal below the <br />sump and that the lower portion of the mine made very little water, <br />He stated that the spring in the slope was the source of water for <br />the Coal Creek Well, <br />b) In a study of the Coal Creek water supply by United Western <br />Engineers in 1974, the following was stated: <br />". Three members of the Town Board were in the slope <br />in 1969 or 1970 and reported it dry except in the westerly <br />third, There are apparently two main pockets of water in <br />the mine, one near the air shaft and one near the westerly <br />end of the slope, A well was surveyed to be drilled near <br />the west end, but instead was drilled as shown on Plate 3 <br />near the middle of the slope in March 1970. This well hit <br />'gob' or pile of rock on the edge of the slope, extracted <br />electrical blasting wire, but the well was dry." <br />Additional information on the mine and water system is <br />included in the report, including water tests on the upper <br />pool of water which shows the vrater to be of "remarkably <br />high quality," <br />c) The town of Coal Creek installed a pump in the mine air <br />shaft in 1969, Caving in the shaft resulted in the drilling <br />of a well into the upper portion of the mine in August 1975. <br />This well eras permitted as a replacement well in June 1975, <br />Permit No. 019890-F, In 1979 additional wells were drilled <br />near the bottom of the slope resulting in the present well <br />location in the upper mine sump. Electric power was dis- <br />connected at the pump meter in January 1983. No useage had <br />been recorded for two years prior to that time, <br />~ i <br />
The URL can be used to link to this page
Your browser does not support the video tag.