Laserfiche WebLink
<br /> <br />the sedimentation pond. The program should consist of at least monthly mini- <br />toring of continuous discharge during spring runoff, and thereafter discharge <br />from single events for the approximate parameters. <br />Response D <br />We believe what OSM is requesting is that a Stevens Recorder be installed <br />along the stream channel for continuous monitoring of the stage during spring <br />months, and a crest gauge indicator be installed to measure any other peaks <br />from runoff events during the rest of the year. These facilities will be in- <br />stalled if they satisfy the requirements of the OSM. <br />-2- <br /> <br />