Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Drill Pad and Access Corridor Reclamation <br />Regrading Drill Pad/Topsoil Distribution <br />(11 locations, total 2.5 acres) <br />D-6 dozer (@$65/hr.) <br />6 hours/location * 65/hr.* 11 locations <br />Subtotal - $4,290 <br />Regrading Access/Topsoil Distribution <br />4700 feet(1.5 acres) of new access road (14' wide) to sites <br />PDH-1, PDH-3, PDH-5, and PDH-15. Access corridors (0.9 <br />acres to each site). <br />(1.9 acres / .04 acres/hr.) * $65/hr. <br />Subtotal - $3,088 <br />Total Regrading $7,378 <br />Revegetation <br />$300/acre 4.4 acres <br />Total Revegetation $1,320 <br />Equipment Mobilization and Demobilization <br />Mob/Demob $2,500 <br />Sub-Total $44,744 <br />25~ Admin. $11,186 <br />10~ Contingency $5,593 <br />ESTID9e,TED RECLAMATION COST $61,523 <br />(Eleven Hole Modification) <br />D.G.M. ESTIMATED RECLAMATION $42,734 <br />(Seven Hole Program, 2/2/96) <br />TOTAL ESTI2~~TED RECLAMATION LIABILITY $104,257 <br />