Laserfiche WebLink
Mr. Dan Mathews <br />June 27, 1983 <br />Page 2 <br />of the river (approximately 5,800 feet) is reached. No groundwater <br />was encountered during construction of the loadout facility site or <br />excavation of the two backhoe pits. From this information, it is <br />quite evident that groundwater is not present in the loadout pad area. <br />With this additional information and the information previously <br />provided to the Division, the Terror Creek Company strongly believes <br />that sufficient evidence has been presented to show that the loadout <br />site should not be classified as an AV F. <br />Sincerely, <br />ACZ INC. <br />Ulnt~ru(.~l~G/~`~/ <br />Dianna Tickner <br />cc: R. Chilton <br />D. Sturges <br />A A ~ u~c. <br />